Substation Scout

tap LakeCr1 - TempSS substation interconnection queue

2 active projects totalling 144.6 MW in the ERCOT queue.

2active projects
144.6active MW
2total filed
Queue IDProjectkVMWResourceStatus
20INR0106 Wang Solar SLF 345 144.6 Solar SS Completed, FIS Started, No IA
22INR0514 Wang Storage SLF 345 0 Battery SS Completed, FIS Started, No IA

A request with terminal status left the queue as filed. That is a record of the filing, not evidence of injection capacity at this location. Confirm deliverability with ERCOT before relying on these figures.