Tap Groesbeck - Otto Junction substation interconnection queue

2 active projects totalling 60.6 MW in the ERCOT queue.

2active projects
60.6active MW
2total filed
Queue IDProjectkVMWResourceStatus
28INR0147 Fallstone Solar SLF 69 60.6 Solar SS Completed, FIS Started, No IA
28INR0149 Fallstone Storage SLF 69 0 Battery SS Completed, FIS Started, No IA

A request with terminal status left the queue as filed. That is a record of the filing, not evidence of injection capacity at this location. Confirm deliverability with ERCOT before relying on these figures.