Reforzar substation interconnection queue

2 active projects totalling 415.2 MW in the ERCOT queue.

2active projects
415.2active MW
2total filed
Queue IDProjectkVMWResourceStatus
27INR0400 Reforzar BESS 1 345 207.6 Battery SS Completed, FIS Completed, No IA
27INR0401 Reforzar Bess 2 345 207.6 Battery SS Completed, FIS Started, No IA

A request with terminal status left the queue as filed. That is a record of the filing, not evidence of injection capacity at this location. Confirm deliverability with ERCOT before relying on these figures.