Substation Scout

Holt Switch Substation substation interconnection queue

2 active projects totalling 112.3 MW in the ERCOT queue.

2active projects
112.3active MW
2total filed
Queue IDProjectkVMWResourceStatus
27INR0422 M-Bar BESS I 138 82.1 Battery SS Completed, FIS Started, No IA
27INR0421 M-Bar Solar I 138 30.2 Solar SS Completed, FIS Started, No IA

Capacity that has left the queue does not automatically become available injection capacity — a withdrawal frees study position. Confirm deliverability with ERCOT before relying on these figures.