2 active projects totalling 487.9 MW in the ERCOT queue.

2active projects
487.9active MW
2total filed
Queue IDProjectkVMWResourceStatus
28INR0323 Velociraptor BESS II 345 246.1 Battery SS Completed, FIS Started, No IA
28INR0322 Velociraptor Solar II 345 241.8 Solar SS Completed, FIS Started, No IA

A request with terminal status left the queue as filed. That is a record of the filing, not evidence of injection capacity at this location. Confirm deliverability with ERCOT before relying on these figures.