Deepwater substation interconnection queue
2 active projects totaling 817.1 MW in the ERCOT queue.
2 ERCOT queue filings name Deepwater as the point of interconnection, all in Harris County, TX.
Target commercial operation date as filed: Oct 2029 (2 filings). 2 active filings target a date after November 27, 2026.
Interconnecting entity as filed: AES Distributed Energy, Inc (2 filings).
| Queue ID | Project | kV | MW | Resource | Status | Target COD |
|---|---|---|---|---|---|---|
| 23INR0127 | Beacon Storage | 345 | 408.7 | Battery | SS Completed, FIS Started, No IA | Oct 2029 |
| 23INR0126 | Sigma Storage | 138 | 408.4 | Battery | SS Completed, FIS Started, No IA | Oct 2029 |
A request with terminal status left the queue as filed. That is a record of the filing, not evidence of injection capacity at this location. Confirm deliverability with ERCOT before relying on these figures.
Same name on other Substation Scout pages
Other sources that print a substation named “Deepwater” in TX. They are matched by name and state only, so a page listed here may describe a different substation with the same name. Check the location and utility on each.
- Deepwater: Expansion Tracker, ERCOT planning (Harris County, TX)
Other ERCOT queue substations in Harris County, TX
- Cedar Bayou: 2 active, 1,103 MW of 2 filed