Substation Scout

Deepwater substation interconnection queue

2 active projects totaling 817.1 MW in the ERCOT queue.

2 ERCOT queue filings name Deepwater as the point of interconnection, all in Harris County, TX.

Target commercial operation date as filed: Oct 2029 (2 filings). 2 active filings target a date after November 27, 2026.

Interconnecting entity as filed: AES Distributed Energy, Inc (2 filings).

2active projects
817.1active MW
2total filed
Queue IDProjectkVMWResourceStatusTarget COD
23INR0127 Beacon Storage 345 408.7 Battery SS Completed, FIS Started, No IA Oct 2029
23INR0126 Sigma Storage 138 408.4 Battery SS Completed, FIS Started, No IA Oct 2029

A request with terminal status left the queue as filed. That is a record of the filing, not evidence of injection capacity at this location. Confirm deliverability with ERCOT before relying on these figures.

Same name on other Substation Scout pages

Other sources that print a substation named “Deepwater” in TX. They are matched by name and state only, so a page listed here may describe a different substation with the same name. Check the location and utility on each.

Other ERCOT queue substations in Harris County, TX

All 35 ERCOT queue filings in Harris County, TX.

Site Scanner

Before you spend weeks on a site, spend seconds screening it.

Scan a site →

Or read a sample report first