Cobb Switching Station substation interconnection queue

2 active projects totalling 326 MW in the ERCOT queue.

2active projects
326active MW
2total filed
Queue IDProjectkVMWResourceStatus
26INR0612 Clay County Yang Storage 345 307.5 Battery SS Completed, FIS Started, No IA
25INR0583 Shannon Wind Repower 345 18.5 Wind SS Completed, FIS Started, No IA

A request with terminal status left the queue as filed. That is a record of the filing, not evidence of injection capacity at this location. Confirm deliverability with ERCOT before relying on these figures.