Cobb Switching Station substation interconnection queue

2 active projects totalling 325.8 MW in the ERCOT queue.

2active projects
325.8active MW
2total filed
Queue IDProjectkVMWResourceStatus
26INR0612 Clay County Yang Storage 345 307.3 Battery SS Completed, FIS Started, No IA
25INR0583 Shannon Wind Repower 345 18.5 Wind SS Completed, FIS Started, No IA

Capacity that has left the queue does not automatically become available injection capacity — a withdrawal frees study position. Confirm deliverability with ERCOT before relying on these figures.