Archer, TX interconnection queue
7 active projects totalling 826.9 MW in the ERCOT queue, plus 1 with terminal status (shown greyed).
7active projects
826.9active MW
8total filed
| Queue ID | Project | kV | MW | Resource | Status |
|---|---|---|---|---|---|
| 28INR0088 | Red Hollow Renewable Energy Solar SLF | 345 | 308.6 | Solar | SS Completed, FIS Started, No IA |
| 28INR0348 | Ringtail Energy Storage | 138 | 203.8 | Battery | SS Completed, FIS Started, No IA |
| 25INR0628 | Wichita Falls Energy Storage | 345 | 202 | Battery | SS Completed, FIS Started, No IA |
| 28INR0373 | Berryman Road Storage | n/r | 150.4 | Battery | Cancelled |
| 26INR0295 | Trinity Hills BESS SLF | 345 | 94 | Battery | SS Completed, FIS Started, No IA |
| 25INR0583 | Shannon Wind Repower | 345 | 18.5 | Wind | SS Completed, FIS Started, No IA |
| 25INR0616 | Bobcat Bluff Storage SLF | 138 | 0 | Battery | SS Completed, FIS Completed, IA |
| 27INR0279 | Red Hollow Renewable Energy BESS SLF | 345 | 0 | Battery | SS Completed, FIS Started, No IA |
Capacity that has left the queue does not automatically become available injection capacity — a withdrawal frees study position. Confirm deliverability with ERCOT before relying on these figures.