Substation Scout

Tap Riley - West Krum ckt 1 substation interconnection queue

2 active projects totalling 1,107.3 MW in the ERCOT queue.

2active projects
1,107.3active MW
2total filed
Queue IDProjectkVMWResourceStatus
23INR0228 Hiru Solar 345 603.7 Solar SS Completed, FIS Started, No IA
24INR0444 Hiru Storage 345 503.6 Battery SS Completed, FIS Started, No IA

Capacity that has left the queue does not automatically become available injection capacity — a withdrawal frees study position. Confirm deliverability with ERCOT before relying on these figures.