Tap Riley - West Krum ckt 1 substation interconnection queue

2 active projects totalling 1,107.3 MW in the ERCOT queue.

2active projects
1,107.3active MW
2total filed
Queue IDProjectkVMWResourceStatus
23INR0228 Hiru Solar 345 603.7 Solar SS Completed, FIS Started, No IA
24INR0444 Hiru Storage 345 503.6 Battery SS Completed, FIS Started, No IA

A request with terminal status left the queue as filed. That is a record of the filing, not evidence of injection capacity at this location. Confirm deliverability with ERCOT before relying on these figures.