Clay, TX interconnection queue

4 active projects totalling 1,866.5 MW in the ERCOT queue, plus 1 with terminal status (shown greyed).

4active projects
1,866.5active MW
5total filed
Queue IDProjectkVMWResourceStatus
23INR0228 Hiru Solar 345 603.7 Solar SS Completed, FIS Started, No IA
24INR0444 Hiru Storage 345 503.6 Battery SS Completed, FIS Started, No IA
25INR0097 Soleil Solar 345 451.7 Solar SS Completed, FIS Started, IA
26INR0612 Clay County Yang Storage 345 307.5 Battery SS Completed, FIS Started, No IA
20INR0029 Lutum Wind 345 241.5 Wind Cancelled

A request with terminal status left the queue as filed. That is a record of the filing, not evidence of injection capacity at this location. Confirm deliverability with ERCOT before relying on these figures.