Substation Scout

Brown substation interconnection queue

2 active projects totalling 630.4 MW in the ERCOT queue.

2active projects
630.4active MW
2total filed
Queue IDProjectkVMWResourceStatus
21INR0294 Mountaineer Solar 345 329.3 Solar SS Completed, FIS Started, No IA
19INR0075 Horseshoe Bend Solar 345 301.1 Solar SS Completed, FIS Started, No IA

A request with terminal status left the queue as filed. That is a record of the filing, not evidence of injection capacity at this location. Confirm deliverability with ERCOT before relying on these figures.