Substation Scout

Brown, TX interconnection queue

10 active projects totalling 2,215.3 MW in the ERCOT queue, plus 2 with terminal status (shown greyed).

10active projects
2,215.3active MW
12total filed
Queue IDProjectkVMWResourceStatus
28INR0166 Brookesmith Storage n/r 351 Battery SS Completed, FIS Started, No IA
21INR0294 Mountaineer Solar 345 329.3 Solar SS Completed, FIS Started, No IA
26INR0518 Radian Storage II n/r 320 Battery Inactive
26INR0541 Radian Storage IIB n/r 320 Battery Inactive
28INR0270 Soluce Bravo Storage 345 302.6 Battery SS Completed, FIS Started, No IA
19INR0075 Horseshoe Bend Solar 345 301.1 Solar SS Completed, FIS Started, No IA
27INR0291 Nouveau BESS 345 256.1 Battery SS Completed, FIS Started, No IA
24INR0544 Wetzel BESS 138 185.6 Battery SS Completed, FIS Started, No IA
24INR0331 Chisme Storage 345 150.7 Battery SS Completed, FIS Completed, No IA
24INR0333 Chisme Solar 345 147 Solar SS Completed, FIS Completed, No IA
27INR0432 Coyote Ridge BESS 138 111.1 Battery SS Completed, FIS Started, No IA
28INR0269 Soluce Bravo Solar 345 80.8 Solar SS Completed, FIS Started, No IA

Capacity that has left the queue does not automatically become available injection capacity — a withdrawal frees study position. Confirm deliverability with ERCOT before relying on these figures.