Tap BROWN SWITCH - BUCKHORN SWITCH substation interconnection queue

2 active projects totalling 297.7 MW in the ERCOT queue.

2active projects
297.7active MW
2total filed
Queue IDProjectkVMWResourceStatus
24INR0331 Chisme Storage 345 150.7 Battery SS Completed, FIS Completed, No IA
24INR0333 Chisme Solar 345 147 Solar SS Completed, FIS Completed, No IA

Capacity that has left the queue does not automatically become available injection capacity — a withdrawal frees study position. Confirm deliverability with ERCOT before relying on these figures.