Key City Solar SLF

ERCOT queue ID 26INR0701

Key City Solar SLF (26INR0701) is listed in the ERCOT interconnection queue as a 989.1 MW solar project in Taylor County, TX. The filing names Abilene Mulberry Creek 345 as its point of interconnection. ERCOT lists its status as “SS Completed, FIS Started, No IA”, with a target commercial operation date of March 31, 2029. It records the screening study as complete on September 30, 2025.

Queue ID26INR0701
Project nameKey City Solar SLF
Status (as published)SS Completed, FIS Started, No IA
SubstationAbilene Mulberry Creek 345
Point of interconnection6235 Abilene Mulberry Creek 345
CountyTaylor
StateTX
VoltageNot reported
Capacity989.1 MW
Resource (as published)SOL/PV
Resource categorySolar (normalized for filtering)
Target commercial operation2029-03-31
Source datasetlarge

In ERCOT's status codes, SS is the screening study, FIS the full interconnection study and IA the interconnection agreement.

Same substation and county

Abilene Mulberry Creek 345 substation: 2 requests in the ERCOT queue, 2 active totaling 991 MW.

Queue IDProjectMWResourceStatus
26INR0700Key City Battery Storage SLF1.9BatterySS Completed, FIS Started, No IA

Taylor, TX: 15 requests in the ERCOT queue, 13 active totaling 3,341.7 MW.

Tracked changes

No changes to this filing observed since ERCOT tracking began on August 27, 2026. Full change log →

Additional filed fields

Interconnecting entityKey City Solar LLC
CDR reporting zoneWEST
Fuel codeSOL
Technology codePV
Screening study complete2025-09-30
Water availabilityNot Required

Fields shown are those promoted into this dataset. The original ISO filing may contain further columns (study reports, agreement dates, milestone flags) that are retained in the pipeline but not all surfaced here. Always confirm against the ISO's published queue before relying on any value.

Site Scanner

Before you spend weeks on a site, spend seconds screening it.

Scan a site →

Or read a sample report first