Glass Mountain BB Solar 5

ERCOT queue ID 29INR0349

Queue ID29INR0349
Project nameGlass Mountain BB Solar 5
Status (as published)SS Completed, FIS Started, No IA
SubstationTap Solstice to Bottlebrush
Point of interconnectionTap 345kV 60404 Solstice to 38441 Bottlebrush
CountyPecos
StateTX
Voltage345 kV
Capacity302.6 MW
Resource (as published)SOL/PV
Resource categorySolar (normalised for filtering)
Target commercial operation2029-10-01
Source datasetlarge

Tracked changes

1 change observed between weekly snapshots of the ERCOT queue since ERCOT tracking began on August 27, 2026. MW is nameplate as filed; for a capacity revision it is the change, not the new total.

DetectedChangeMWStatus was → now
2026-09-07 Status change n/a SS Started, FIS Started, No IA → SS Completed, FIS Started, No IA

Full change log →

Additional filed fields

Interconnecting EntityGlass Mountain Solar V, LLC
Cdr ZoneWEST
Fuel CodeSOL
Technology CodePV
Screening Study Complete46262
Water AvailabilityNot Required

Fields shown are those promoted into this dataset. The original ISO filing may contain further columns (study reports, agreement dates, milestone flags) that are retained in the pipeline but not all surfaced here. Always confirm against the ISO's published queue before relying on any value.