Project FluxNet Solar SLF

ERCOT queue ID 29INR0238

Project FluxNet Solar SLF (29INR0238) is listed in the ERCOT interconnection queue as a 273.8 MW solar project in Jones County, TX. The filing names tap Clear Crossing - Coody Cross as its point of interconnection. ERCOT lists its status as “SS Completed, FIS Started, No IA”, with a target commercial operation date of March 31, 2029. It records the screening study as complete on May 1, 2026.

Queue ID29INR0238
Project nameProject FluxNet Solar SLF
Status (as published)SS Completed, FIS Started, No IA
Substationtap Clear Crossing - Coody Cross
Point of interconnectiontap 345kV 60514 Clear Crossing - 11419 Coody Cross
CountyJones
StateTX
Voltage345 kV
Capacity273.8 MW
Resource (as published)SOL/PV
Resource categorySolar (normalized for filtering)
Target commercial operation2029-03-31
Source datasetlarge

In ERCOT's status codes, SS is the screening study, FIS the full interconnection study and IA the interconnection agreement.

Same substation and county

tap Clear Crossing - Coody Cross substation: 3 requests in the ERCOT queue, 3 active totaling 608.1 MW.

Queue IDProjectMWResourceStatus
29INR0240Project Golf Solar SLF273.4SolarSS Completed, FIS Started, No IA
29INR0239Project FluxNet Battery SLF60.9BatterySS Completed, FIS Started, No IA

Jones, TX: 21 requests in the ERCOT queue, 18 active totaling 4,419.8 MW.

Tracked changes

1 change observed between weekly snapshots of the ERCOT queue since ERCOT tracking began on August 27, 2026. MW is nameplate as filed; for a capacity revision it is the change, not the new total.

DetectedChangeMWStatus was → now
2026-11-09 New request 273.8 Not reported → SS Completed, FIS Started, No IA

Full change log →

Additional filed fields

Interconnecting entitySGE Project Foxtrot LLC
CDR reporting zoneWEST
Fuel codeSOL
Technology codePV
Screening study complete2026-05-01
Water availabilityNot Required

Fields shown are those promoted into this dataset. The original ISO filing may contain further columns (study reports, agreement dates, milestone flags) that are retained in the pipeline but not all surfaced here. Always confirm against the ISO's published queue before relying on any value.

Site Scanner

Before you spend weeks on a site, spend seconds screening it.

Scan a site →

Or read a sample report first