Home / ERCOT / Substations / tap Clear Crossing - Coody Cross
tap Clear Crossing - Coody Cross substation interconnection queue
3 active projects
totaling 608.1 MW in the ERCOT queue.
3 ERCOT queue filings name tap Clear Crossing - Coody Cross as the point of interconnection, all in TX.
3 active projects
608.1 active MW
3 total filed
Queue ID Project kV MW Resource Status
29INR0238
Project FluxNet Solar SLF
345
273.8
Solar
SS Completed, FIS Started, No IA
29INR0240
Project Golf Solar SLF
345
273.4
Solar
SS Completed, FIS Started, No IA
29INR0239
Project FluxNet Battery SLF
345
60.9
Battery
SS Completed, FIS Started, No IA
A request with terminal status left the queue as filed.
That is a record of the filing, not evidence of injection capacity at this location.
Confirm deliverability with ERCOT before relying on these figures.
Site Scanner draws on HIFLD substations and electric retail service
territories, newer substations HIFLD lacks from OpenStreetMap, EIA gas transmission pipelines, HIFLD gas facilities and gas
utility territories, USGS watershed boundaries, FEMA flood hazard layers and US Census
geocoding. Queue data is compiled from public interconnection
queue filings. Every figure carries its source and retrieval date.
A withdrawal records that a request left the queue. It says
nothing about injection capacity at that location. Verify with the relevant ISO before
relying on any figure. Queue datasets are tracked separately and are
not directly comparable: status vocabularies, fuel coding, and publication
cadence all differ.
Screening aid only. Not a system impact study. Contiguous US.