Project Golf Solar SLF
ERCOT queue ID 29INR0240
Project Golf Solar SLF (29INR0240) is listed in the ERCOT interconnection queue as a 273.4 MW solar project in Haskell County, TX. The filing names tap Clear Crossing - Coody Cross as its point of interconnection. ERCOT lists its status as “SS Completed, FIS Started, No IA”, with a target commercial operation date of March 31, 2029. It records the screening study as complete on May 1, 2026.
| Queue ID | 29INR0240 |
|---|---|
| Project name | Project Golf Solar SLF |
| Status (as published) | SS Completed, FIS Started, No IA |
| Substation | tap Clear Crossing - Coody Cross |
| Point of interconnection | tap 345kV 60514 Clear Crossing - 11419 Coody Cross |
| County | Haskell |
| State | TX |
| Voltage | 345 kV |
| Capacity | 273.4 MW |
| Resource (as published) | SOL/PV |
| Resource category | Solar (normalized for filtering) |
| Target commercial operation | 2029-03-31 |
| Source dataset | large |
In ERCOT's status codes, SS is the screening study, FIS the full interconnection study and IA the interconnection agreement.
Same substation and county
tap Clear Crossing - Coody Cross substation: 3 requests in the ERCOT queue, 3 active totaling 608.1 MW.
| Queue ID | Project | MW | Resource | Status |
|---|---|---|---|---|
| 29INR0238 | Project FluxNet Solar SLF | 273.8 | Solar | SS Completed, FIS Started, No IA |
| 29INR0239 | Project FluxNet Battery SLF | 60.9 | Battery | SS Completed, FIS Started, No IA |
Haskell, TX: 20 requests in the ERCOT queue, 18 active totaling 4,249.5 MW.
Tracked changes
1 change observed between weekly snapshots of the ERCOT queue since ERCOT tracking began on August 27, 2026. MW is nameplate as filed; for a capacity revision it is the change, not the new total.
| Detected | Change | MW | Status was → now |
|---|---|---|---|
| 2026-11-09 | New request | 273.4 | Not reported → SS Completed, FIS Started, No IA |
Additional filed fields
| Interconnecting entity | SGE Project Golf LLC |
|---|---|
| CDR reporting zone | WEST |
| Fuel code | SOL |
| Technology code | PV |
| Screening study complete | 2026-05-01 |
| Water availability | Not Required |
Fields shown are those promoted into this dataset. The original ISO filing may contain further columns (study reports, agreement dates, milestone flags) that are retained in the pipeline but not all surfaced here. Always confirm against the ISO's published queue before relying on any value.