Commodus 2 Wind

ERCOT queue ID 29INR0033

Queue ID29INR0033
Project nameCommodus 2 Wind
Status (as published)SS Completed, FIS Started, No IA
SubstationTapping the Double-Circuit Line from Tule Canyon (Bus# ) to Alibates (Bus# )
Point of interconnectionTapping the 345 kV Double-Circuit Line from Tule Canyon (Bus# 23914) to Alibates (Bus# 23900)
CountySwisher
StateTX
Voltage345 kV
Capacity641.5 MW
Resource (as published)WIN/WT
Resource categoryWind (normalised for filtering)
Target commercial operation2029-07-30
Source datasetlarge

Additional filed fields

Interconnecting EntityIP Blackwell II, LLC
Cdr ZonePANHANDLE
Fuel CodeWIN
Technology CodeWT
Screening Study Complete45811
Water AvailabilityNot Required

Fields shown are those promoted into this dataset. The original ISO filing may contain further columns (study reports, agreement dates, milestone flags) that are retained in the pipeline but not all surfaced here. Always confirm against the ISO's published queue before relying on any value.