Swisher, TX interconnection queue

7 active projects totalling 2,049 MW in the ERCOT queue.

7active projects
2,049active MW
7total filed
Queue IDProjectkVMWResourceStatus
29INR0033 Commodus 2 Wind 345 641.5 Wind SS Completed, FIS Started, No IA
22INR0402 Frye Storage 345 503.9 Battery SS Completed, FIS Started, No IA
29INR0032 Commodus 2 Solar 345 502.1 Solar SS Completed, FIS Started, No IA
25INR0282 Hornet Solar II SLF 345 201.5 Solar SS Completed, FIS Started, IA
24INR0003 Stem Solar 345 200 Solar SS Completed, FIS Started, No IA
25INR0283 Hornet Storage II SLF 345 0 Battery SS Completed, FIS Started, IA
27INR0625 Hornet Energy Storage SLF 345 0 Battery SS Completed, FIS Started, No IA

A request with terminal status left the queue as filed. That is a record of the filing, not evidence of injection capacity at this location. Confirm deliverability with ERCOT before relying on these figures.