Tapping the Double-Circuit Line from Tule Canyon (Bus# ) to Alibates (Bus# ) substation interconnection queue

2 active projects totalling 1,143.6 MW in the ERCOT queue.

2active projects
1,143.6active MW
2total filed
Queue IDProjectkVMWResourceStatus
29INR0033 Commodus 2 Wind 345 641.5 Wind SS Completed, FIS Started, No IA
29INR0032 Commodus 2 Solar 345 502.1 Solar SS Completed, FIS Started, No IA

Capacity that has left the queue does not automatically become available injection capacity — a withdrawal frees study position. Confirm deliverability with ERCOT before relying on these figures.