ERCOT queue ID 29INR0012

Aurelius 3 Wind (29INR0012) is listed in the ERCOT interconnection queue as a 497.3 MW wind project in Deaf Smith County, TX. The filing names Deaf Smith station as its point of interconnection. ERCOT lists its status as “SS Completed, FIS Started, No IA”, with a target commercial operation date of June 30, 2030. It records the screening study as complete on March 1, 2024.

Queue ID29INR0012
Project nameAurelius 3 Wind
Status (as published)SS Completed, FIS Started, No IA
SubstationDeaf Smith station
Point of interconnection23908 Deaf Smith station 345kV
CountyDeaf Smith
StateTX
Voltage345 kV
Capacity497.3 MW
Resource (as published)WIN/WT
Resource categoryWind (normalized for filtering)
Target commercial operation2030-06-30
Source datasetlarge

In ERCOT's status codes, SS is the screening study, FIS the full interconnection study and IA the interconnection agreement.

Same substation and county

Deaf Smith station substation: 5 requests in the ERCOT queue, 5 active totaling 4,139.7 MW.

Queue IDProjectMWResourceStatus
29INR0361Aurelius 3 Natural Gas1,275GasSS Completed, FIS Started, No IA
29INR0003Aurelius Solar1,124.2SolarSS Completed, FIS Completed, IA
29INR0004Aurelius Wind621.6WindSS Completed, FIS Completed, IA
29INR0010Aurelius 2 Wind621.6WindSS Completed, FIS Started, No IA

Deaf Smith, TX: 11 requests in the ERCOT queue, 11 active totaling 6,391.9 MW.

Tracked changes

1 change observed between weekly snapshots of the ERCOT queue since ERCOT tracking began on August 27, 2026. MW is nameplate as filed; for a capacity revision it is the change, not the new total.

DetectedChangeMWStatus was → now
2026-10-05 Capacity revised −207.7 SS Completed, FIS Started, No IA → SS Completed, FIS Started, No IA

Full change log →

Additional filed fields

Interconnecting entityIP Roman III, LLC
CDR reporting zonePANHANDLE
Fuel codeWIN
Technology codeWT
Screening study complete2024-03-01
Water availabilityNot Required

Fields shown are those promoted into this dataset. The original ISO filing may contain further columns (study reports, agreement dates, milestone flags) that are retained in the pipeline but not all surfaced here. Always confirm against the ISO's published queue before relying on any value.

Site Scanner

Before you spend weeks on a site, spend seconds screening it.

Scan a site →

Or read a sample report first