Substation Scout

Aurelius Solar

ERCOT queue ID 29INR0003

Aurelius Solar (29INR0003) is listed in the ERCOT interconnection queue as a 1,124.2 MW solar project in Deaf Smith County, TX. The filing names Deaf Smith station as its point of interconnection. ERCOT lists its status as “SS Completed, FIS Completed, IA”, with a target commercial operation date of June 30, 2028. It records the screening study as complete on October 15, 2023, the full interconnection study as approved on September 22, 2025 and the interconnection agreement as signed on October 9, 2025.

Queue ID29INR0003
Project nameAurelius Solar
Status (as published)SS Completed, FIS Completed, IA
SubstationDeaf Smith station
Point of interconnection23908 Deaf Smith station 345 kV
CountyDeaf Smith
StateTX
Voltage345 kV
Capacity1,124.2 MW
Resource (as published)SOL/PV
Resource categorySolar (normalized for filtering)
Target commercial operation2028-06-30
Source datasetlarge

In ERCOT's status codes, SS is the screening study, FIS the full interconnection study and IA the interconnection agreement.

Same substation and county

Deaf Smith station substation: 5 requests in the ERCOT queue, 5 active totaling 4,139.7 MW.

Queue IDProjectMWResourceStatus
29INR0361Aurelius 3 Natural Gas1,275GasSS Completed, FIS Started, No IA
29INR0004Aurelius Wind621.6WindSS Completed, FIS Completed, IA
29INR0010Aurelius 2 Wind621.6WindSS Completed, FIS Started, No IA
29INR0012Aurelius 3 Wind497.3WindSS Completed, FIS Started, No IA

Deaf Smith, TX: 11 requests in the ERCOT queue, 11 active totaling 6,391.9 MW.

Tracked changes

No changes to this filing observed since ERCOT tracking began on August 27, 2026. Full change log →

Additional filed fields

Interconnecting entityIP Roman, LLC
CDR reporting zonePANHANDLE
Fuel codeSOL
Technology codePV
Interconnection agreement signed2025-10-09
Screening study complete2023-10-15
Full interconnection study approved2025-09-22
Water availabilityNot Required

Fields shown are those promoted into this dataset. The original ISO filing may contain further columns (study reports, agreement dates, milestone flags) that are retained in the pipeline but not all surfaced here. Always confirm against the ISO's published queue before relying on any value.

Site Scanner

Before you spend weeks on a site, spend seconds screening it.

Scan a site →

Or read a sample report first