San Gabriel Storage
ERCOT queue ID 28INR0191
San Gabriel Storage (28INR0191) is listed in the ERCOT interconnection queue as a 127.5 MW battery project in Milam County, TX. The filing names Tap Vosslake - Buckholts as its point of interconnection. ERCOT lists its status as “SS Completed, FIS Completed, IA”, with a target commercial operation date of July 1, 2028. It records the screening study as complete on April 17, 2025, the full interconnection study as approved on July 20, 2026 and the interconnection agreement as signed on August 6, 2026.
| Queue ID | 28INR0191 |
|---|---|
| Project name | San Gabriel Storage |
| Status (as published) | SS Completed, FIS Completed, IA |
| Substation | Tap Vosslake - Buckholts |
| Point of interconnection | Tap 138 kV 3750 Vosslake - 3749 Buckholts |
| County | Milam |
| State | TX |
| Voltage | 138 kV |
| Capacity | 127.5 MW |
| Resource (as published) | OTH/BA |
| Resource category | Battery (normalized for filtering) |
| Target commercial operation | 2028-07-01 |
| Source dataset | large |
In ERCOT's status codes, SS is the screening study, FIS the full interconnection study and IA the interconnection agreement.
Same substation and county
Tap Vosslake - Buckholts substation: 2 requests in the ERCOT queue, 2 active totaling 382.5 MW.
| Queue ID | Project | MW | Resource | Status |
|---|---|---|---|---|
| 28INR0185 | San Gabriel Solar | 255 | Solar | SS Completed, FIS Completed, IA |
Milam, TX: 35 requests in the ERCOT queue, 30 active totaling 8,525.6 MW.
Tracked changes
1 change observed between weekly snapshots of the ERCOT queue since ERCOT tracking began on August 27, 2026. MW is nameplate as filed; for a capacity revision it is the change, not the new total.
| Detected | Change | MW | Status was → now |
|---|---|---|---|
| 2026-09-07 | Status change | n/a | SS Completed, FIS Completed, No IA → SS Completed, FIS Completed, IA |
Additional filed fields
| Interconnecting entity | San Gabriel Solar LLC |
|---|---|
| CDR reporting zone | SOUTH |
| Fuel code | OTH |
| Technology code | BA |
| Interconnection agreement signed | 2026-08-06 |
| Screening study complete | 2025-04-17 |
| Full interconnection study approved | 2026-07-20 |
| Air permit | Not Required |
Fields shown are those promoted into this dataset. The original ISO filing may contain further columns (study reports, agreement dates, milestone flags) that are retained in the pipeline but not all surfaced here. Always confirm against the ISO's published queue before relying on any value.