San Gabriel Solar

ERCOT queue ID 28INR0185

San Gabriel Solar (28INR0185) is listed in the ERCOT interconnection queue as a 255 MW solar project in Milam County, TX. The filing names Tap Vosslake - Buckholts as its point of interconnection. ERCOT lists its status as “SS Completed, FIS Completed, IA”, with a target commercial operation date of July 1, 2028. It records the screening study as complete on April 17, 2025, the full interconnection study as approved on July 20, 2026 and the interconnection agreement as signed on August 6, 2026.

Queue ID28INR0185
Project nameSan Gabriel Solar
Status (as published)SS Completed, FIS Completed, IA
SubstationTap Vosslake - Buckholts
Point of interconnectionTap 138 kV 3750 Vosslake - 3749 Buckholts
CountyMilam
StateTX
Voltage138 kV
Capacity255 MW
Resource (as published)SOL/PV
Resource categorySolar (normalized for filtering)
Target commercial operation2028-07-01
Source datasetlarge

In ERCOT's status codes, SS is the screening study, FIS the full interconnection study and IA the interconnection agreement.

Same substation and county

Tap Vosslake - Buckholts substation: 2 requests in the ERCOT queue, 2 active totaling 382.5 MW.

Queue IDProjectMWResourceStatus
28INR0191San Gabriel Storage127.5BatterySS Completed, FIS Completed, IA

Milam, TX: 35 requests in the ERCOT queue, 30 active totaling 8,525.6 MW.

Tracked changes

1 change observed between weekly snapshots of the ERCOT queue since ERCOT tracking began on August 27, 2026. MW is nameplate as filed; for a capacity revision it is the change, not the new total.

DetectedChangeMWStatus was → now
2026-09-07 Status change n/a SS Completed, FIS Completed, No IA → SS Completed, FIS Completed, IA

Full change log →

Additional filed fields

Interconnecting entitySan Gabriel Solar LLC
CDR reporting zoneSOUTH
Fuel codeSOL
Technology codePV
Interconnection agreement signed2026-08-06
Screening study complete2025-04-17
Full interconnection study approved2026-07-20
Air permitNot Required
Water availabilityNot Required

Fields shown are those promoted into this dataset. The original ISO filing may contain further columns (study reports, agreement dates, milestone flags) that are retained in the pipeline but not all surfaced here. Always confirm against the ISO's published queue before relying on any value.