Armadillo Solar Phase 2

ERCOT queue ID 27INR0614

Armadillo Solar Phase 2 (27INR0614) is listed in the ERCOT interconnection queue as a 200.7 MW solar project in Navarro County, TX. The filing names Revolution as its point of interconnection. ERCOT lists its status as “SS Completed, FIS Started, No IA”, with a target commercial operation date of March 4, 2027. It records the screening study as complete on July 24, 2026.

Queue ID27INR0614
Project nameArmadillo Solar Phase 2
Status (as published)SS Completed, FIS Started, No IA
SubstationRevolution
Point of interconnection3387 Revolution 138kV
CountyNavarro
StateTX
Voltage138 kV
Capacity200.7 MW
Resource (as published)SOL/PV
Resource categorySolar (normalized for filtering)
Target commercial operation2027-03-04
Source datasetlarge

In ERCOT's status codes, SS is the screening study, FIS the full interconnection study and IA the interconnection agreement.

Same substation and county

Revolution substation: 3 requests in the ERCOT queue, 3 active totaling 451.6 MW.

Queue IDProjectMWResourceStatus
21INR0421Armadillo Solar150.5SolarSS Completed, FIS Completed, IA
28INR0467Main Horn Solar100.4SolarSS Completed, FIS Started, No IA

Navarro, TX: 29 requests in the ERCOT queue, 26 active totaling 4,412.7 MW.

Tracked changes

No changes to this filing observed since ERCOT tracking began on August 27, 2026. Full change log →

Additional filed fields

Interconnecting entityArmadillo Solar Center, LLC
CDR reporting zoneNORTH
Fuel codeSOL
Technology codePV
Screening study complete2026-07-24
Water availabilityNot Required

Fields shown are those promoted into this dataset. The original ISO filing may contain further columns (study reports, agreement dates, milestone flags) that are retained in the pipeline but not all surfaced here. Always confirm against the ISO's published queue before relying on any value.