Lone Bow Solar
ERCOT queue ID 26INR0419
| Queue ID | 26INR0419 |
|---|---|
| Project name | Lone Bow Solar |
| Status (as published) | SS Started, FIS Started, No IA |
| Substation | Tap Comstock - Corral |
| Point of interconnection | Tap 138 kV 8683 Comstock - 60389 Corral |
| County | Val Verde |
| State | TX |
| Voltage | 138 kV |
| Capacity | 277.5 MW |
| Resource (as published) | SOL/PV |
| Resource category | Solar (normalised for filtering) |
| Target commercial operation | 2030-06-15 |
| Source dataset | large |
Additional filed fields
| Interconnecting Entity | Greenalia Solar Power Lone Bow LLC |
|---|---|
| Cdr Zone | WEST |
| Fuel Code | SOL |
| Technology Code | PV |
| Water Availability | Not Required |
Fields shown are those promoted into this dataset. The original ISO filing may contain further columns (study reports, agreement dates, milestone flags) that are retained in the pipeline but not all surfaced here. Always confirm against the ISO's published queue before relying on any value.