Tap Comstock - Corral substation interconnection queue
2 active projects totalling 372.3 MW in the ERCOT queue.
2active projects
372.3active MW
2total filed
| Queue ID | Project | kV | MW | Resource | Status |
|---|---|---|---|---|---|
| 26INR0419 | Lone Bow Solar | 138 | 277.5 | Solar | SS Started, FIS Started, No IA |
| 25INR0546 | VISOL 1 SOLAR | 138 | 94.8 | Solar | SS Completed, FIS Started, No IA |
Capacity that has left the queue does not automatically become available injection capacity — a withdrawal frees study position. Confirm deliverability with ERCOT before relying on these figures.