Val Verde, TX interconnection queue

3 active projects totalling 475.3 MW in the ERCOT queue, plus 2 with terminal status (shown greyed).

3active projects
475.3active MW
5total filed
Queue IDProjectkVMWResourceStatus
25INR0398 Pumpville Ranch 1 n/r 1,000 Solar Inactive
26INR0419 Lone Bow Solar 138 277.5 Solar SS Started, FIS Started, No IA
20INR0271 Blue Hills Wind n/r 276 Wind Inactive
26INR0260 Evans Creek Energy Storage 138 103 Battery SS Completed, FIS Started, No IA
25INR0546 VISOL 1 SOLAR 138 94.8 Solar SS Completed, FIS Started, No IA

Capacity that has left the queue does not automatically become available injection capacity — a withdrawal frees study position. Confirm deliverability with ERCOT before relying on these figures.