Nanulak BESS
ERCOT queue ID 26INR0385
Nanulak BESS (26INR0385) is listed in the ERCOT interconnection queue as a 181.5 MW battery project in Reeves County, TX. The filing names TNCOYOTSPG1 as its point of interconnection. ERCOT lists its status as “SS Completed, FIS Completed, IA”, with a target commercial operation date of June 30, 2027. It records the screening study as complete on June 19, 2024, the full interconnection study as approved on June 6, 2026 and the interconnection agreement as signed on November 19, 2025.
| Queue ID | 26INR0385 |
|---|---|
| Project name | Nanulak BESS |
| Status (as published) | SS Completed, FIS Completed, IA |
| Substation | TNCOYOTSPG1 |
| Point of interconnection | 38113 TNCOYOTSPG1 138kV |
| County | Reeves |
| State | TX |
| Voltage | 138 kV |
| Capacity | 181.5 MW |
| Resource (as published) | OTH/BA |
| Resource category | Battery (normalized for filtering) |
| Target commercial operation | 2027-06-30 |
| Source dataset | large |
In ERCOT's status codes, SS is the screening study, FIS the full interconnection study and IA the interconnection agreement.
Same substation and county
TNCOYOTSPG1 substation: 2 requests in the ERCOT queue, 2 active totaling 313.5 MW.
| Queue ID | Project | MW | Resource | Status |
|---|---|---|---|---|
| 26INR0396 | Kodiak AGR1 | 132 | Other | SS Completed, FIS Started, No IA |
Reeves, TX: 27 requests in the ERCOT queue, 24 active totaling 8,349.7 MW.
Tracked changes
1 change observed between weekly snapshots of the ERCOT queue since ERCOT tracking began on August 27, 2026. MW is nameplate as filed; for a capacity revision it is the change, not the new total.
| Detected | Change | MW | Status was → now |
|---|---|---|---|
| 2026-09-07 | Status change | n/a | SS Completed, FIS Started, IA → SS Completed, FIS Completed, IA |
Additional filed fields
| Interconnecting entity | Nanulak BESS, L.L.C. |
|---|---|
| CDR reporting zone | WEST |
| Fuel code | OTH |
| Technology code | BA |
| Interconnection agreement signed | 2025-11-19 |
| Screening study complete | 2024-06-19 |
| Full interconnection study approved | 2026-06-06 |
Fields shown are those promoted into this dataset. The original ISO filing may contain further columns (study reports, agreement dates, milestone flags) that are retained in the pipeline but not all surfaced here. Always confirm against the ISO's published queue before relying on any value.