Nanulak BESS

ERCOT queue ID 26INR0385

Nanulak BESS (26INR0385) is listed in the ERCOT interconnection queue as a 181.5 MW battery project in Reeves County, TX. The filing names TNCOYOTSPG1 as its point of interconnection. ERCOT lists its status as “SS Completed, FIS Completed, IA”, with a target commercial operation date of June 30, 2027. It records the screening study as complete on June 19, 2024, the full interconnection study as approved on June 6, 2026 and the interconnection agreement as signed on November 19, 2025.

Queue ID26INR0385
Project nameNanulak BESS
Status (as published)SS Completed, FIS Completed, IA
SubstationTNCOYOTSPG1
Point of interconnection38113 TNCOYOTSPG1 138kV
CountyReeves
StateTX
Voltage138 kV
Capacity181.5 MW
Resource (as published)OTH/BA
Resource categoryBattery (normalized for filtering)
Target commercial operation2027-06-30
Source datasetlarge

In ERCOT's status codes, SS is the screening study, FIS the full interconnection study and IA the interconnection agreement.

Same substation and county

TNCOYOTSPG1 substation: 2 requests in the ERCOT queue, 2 active totaling 313.5 MW.

Queue IDProjectMWResourceStatus
26INR0396Kodiak AGR1132OtherSS Completed, FIS Started, No IA

Reeves, TX: 27 requests in the ERCOT queue, 24 active totaling 8,349.7 MW.

Tracked changes

1 change observed between weekly snapshots of the ERCOT queue since ERCOT tracking began on August 27, 2026. MW is nameplate as filed; for a capacity revision it is the change, not the new total.

DetectedChangeMWStatus was → now
2026-09-07 Status change n/a SS Completed, FIS Started, IA → SS Completed, FIS Completed, IA

Full change log →

Additional filed fields

Interconnecting entityNanulak BESS, L.L.C.
CDR reporting zoneWEST
Fuel codeOTH
Technology codeBA
Interconnection agreement signed2025-11-19
Screening study complete2024-06-19
Full interconnection study approved2026-06-06

Fields shown are those promoted into this dataset. The original ISO filing may contain further columns (study reports, agreement dates, milestone flags) that are retained in the pipeline but not all surfaced here. Always confirm against the ISO's published queue before relying on any value.