Realitos Solar SLF

ERCOT queue ID 26INR0196 Terminal status

Queue ID26INR0196
Project nameRealitos Solar SLF
Status (as published)Inactive
SubstationBruni (#) – Crestonio (#) line; AEP
Point of interconnectionBruni (#8297) – Crestonio (#8695) 138 kV line; AEP
CountyDuval
StateTX
Voltage138 kV
Capacity150.5 MW
Resource (as published)SOL/PV
Resource categorySolar (normalised for filtering)
Target commercial operation2028-12-15
Source datasetinactive

Tracked changes

1 change observed between weekly snapshots of the ERCOT queue since ERCOT tracking began on August 27, 2026. MW is nameplate as filed; for a capacity revision it is the change, not the new total.

DetectedChangeMWStatus was → now
2026-10-05 Terminal status 150.5 SS Completed, FIS Started, No IA → Inactive

Full change log →

Additional filed fields

Fuel CodeSolar
Size CategoryLarge

Fields shown are those promoted into this dataset. The original ISO filing may contain further columns (study reports, agreement dates, milestone flags) that are retained in the pipeline but not all surfaced here. Always confirm against the ISO's published queue before relying on any value.