Forts Trail BESS 2 (24INR0488) is listed in the ERCOT interconnection queue as a 205.5 MW battery project in Taylor County, TX. The filing names Central Bluff Switch as its point of interconnection. ERCOT lists its status as “SS Completed, FIS Started, No IA”, with a target commercial operation date of March 2, 2029. It records the screening study as complete on May 20, 2023.

Queue ID24INR0488
Project nameForts Trail BESS 2
Status (as published)SS Completed, FIS Started, No IA
SubstationCentral Bluff Switch
Point of interconnection11406 Central Bluff Switch 345 kV
CountyTaylor
StateTX
Voltage345 kV
Capacity205.5 MW
Resource (as published)OTH/BA
Resource categoryBattery (normalized for filtering)
Target commercial operation2029-03-02
Source datasetlarge

In ERCOT's status codes, SS is the screening study, FIS the full interconnection study and IA the interconnection agreement.

Same substation and county

Central Bluff Switch substation: 3 requests in the ERCOT queue, 3 active totaling 615.1 MW.

Queue IDProjectMWResourceStatus
24INR0341Forts Trail BESS208.8BatterySS Completed, FIS Started, No IA
24INR0308Forts Trail Solar200.8SolarSS Completed, FIS Started, No IA

Taylor, TX: 15 requests in the ERCOT queue, 13 active totaling 3,341.7 MW.

Tracked changes

No changes to this filing observed since ERCOT tracking began on August 27, 2026. Full change log →

Additional filed fields

Interconnecting entityJC Central Bluff, LLC
CDR reporting zoneWEST
Fuel codeOTH
Technology codeBA
Screening study complete2023-05-20
Air permitNot Required

Fields shown are those promoted into this dataset. The original ISO filing may contain further columns (study reports, agreement dates, milestone flags) that are retained in the pipeline but not all surfaced here. Always confirm against the ISO's published queue before relying on any value.