Substation Scout

Forts Trail BESS

ERCOT queue ID 24INR0341

Forts Trail BESS (24INR0341) is listed in the ERCOT interconnection queue as a 208.8 MW battery project in Taylor County, TX. The filing names Central Bluff Switch as its point of interconnection. ERCOT lists its status as “SS Completed, FIS Started, No IA”, with a target commercial operation date of March 2, 2029. It records the screening study as complete on August 30, 2022.

Queue ID24INR0341
Project nameForts Trail BESS
Status (as published)SS Completed, FIS Started, No IA
SubstationCentral Bluff Switch
Point of interconnection11406 Central Bluff Switch 345kV
CountyTaylor
StateTX
Voltage345 kV
Capacity208.8 MW
Resource (as published)OTH/BA
Resource categoryBattery (normalized for filtering)
Target commercial operation2029-03-02
Source datasetlarge

In ERCOT's status codes, SS is the screening study, FIS the full interconnection study and IA the interconnection agreement.

Same substation and county

Central Bluff Switch substation: 3 requests in the ERCOT queue, 3 active totaling 615.1 MW.

Queue IDProjectMWResourceStatus
24INR0488Forts Trail BESS 2205.5BatterySS Completed, FIS Started, No IA
24INR0308Forts Trail Solar200.8SolarSS Completed, FIS Started, No IA

Taylor, TX: 15 requests in the ERCOT queue, 13 active totaling 3,341.7 MW.

Tracked changes

No changes to this filing observed since ERCOT tracking began on August 27, 2026. Full change log →

Additional filed fields

Interconnecting entityJC Central Bluff, LLC
CDR reporting zoneWEST
Fuel codeOTH
Technology codeBA
Screening study complete2022-08-30
Air permitNot Required

Fields shown are those promoted into this dataset. The original ISO filing may contain further columns (study reports, agreement dates, milestone flags) that are retained in the pipeline but not all surfaced here. Always confirm against the ISO's published queue before relying on any value.