ELECTRODE BESS

ERCOT queue ID 24INR0393

ELECTRODE BESS (24INR0393) is listed in the ERCOT interconnection queue as a 150 MW battery project in Upton County, TX. The filing names Castillo as its point of interconnection. ERCOT lists its status as “SS Completed, FIS Started, No IA”, with a target commercial operation date of December 31, 2027. It records the screening study as complete on October 21, 2022.

Queue ID24INR0393
Project nameELECTRODE BESS
Status (as published)SS Completed, FIS Started, No IA
SubstationCastillo
Point of interconnection76040 Castillo 138kV
CountyUpton
StateTX
Voltage138 kV
Capacity150 MW
Resource (as published)OTH/BA
Resource categoryBattery (normalized for filtering)
Target commercial operation2027-12-31
Source datasetlarge

In ERCOT's status codes, SS is the screening study, FIS the full interconnection study and IA the interconnection agreement.

Same substation and county

Castillo substation: 2 requests in the ERCOT queue, 2 active totaling 190 MW.

Queue IDProjectMWResourceStatus
19INR0189SP TX-12B Phase III40SolarSS Completed, FIS Started, No IA

Upton, TX: 22 requests in the ERCOT queue, 18 active totaling 5,611.9 MW.

Tracked changes

No changes to this filing observed since ERCOT tracking began on August 27, 2026. Full change log →

Additional filed fields

Interconnecting entityCED Development Inc.
CDR reporting zoneWEST
Fuel codeOTH
Technology codeBA
Screening study complete2022-10-21
Air permitNot Required

Fields shown are those promoted into this dataset. The original ISO filing may contain further columns (study reports, agreement dates, milestone flags) that are retained in the pipeline but not all surfaced here. Always confirm against the ISO's published queue before relying on any value.