SP TX-12B Phase III

ERCOT queue ID 19INR0189

SP TX-12B Phase III (19INR0189) is listed in the ERCOT interconnection queue as a 40 MW solar project in Upton County, TX. The filing names Castillo as its point of interconnection. ERCOT lists its status as “SS Completed, FIS Started, No IA”, with a target commercial operation date of December 2, 2025. It records the screening study as complete on October 3, 2018.

Queue ID19INR0189
Project nameSP TX-12B Phase III
Status (as published)SS Completed, FIS Started, No IA
SubstationCastillo
Point of interconnection76040 Castillo 138kV
CountyUpton
StateTX
Voltage138 kV
Capacity40 MW
Resource (as published)SOL/PV
Resource categorySolar (normalized for filtering)
Target commercial operation2025-12-02
Source datasetlarge

In ERCOT's status codes, SS is the screening study, FIS the full interconnection study and IA the interconnection agreement.

Same substation and county

Castillo substation: 2 requests in the ERCOT queue, 2 active totaling 190 MW.

Queue IDProjectMWResourceStatus
24INR0393ELECTRODE BESS150BatterySS Completed, FIS Started, No IA

Upton, TX: 22 requests in the ERCOT queue, 18 active totaling 5,611.9 MW.

Tracked changes

No changes to this filing observed since ERCOT tracking began on August 27, 2026. Full change log →

Additional filed fields

Interconnecting entityConEd Development
CDR reporting zoneWEST
Fuel codeSOL
Technology codePV
Screening study complete2018-10-03
Air permitNot Required
Water availabilityNot Required

Fields shown are those promoted into this dataset. The original ISO filing may contain further columns (study reports, agreement dates, milestone flags) that are retained in the pipeline but not all surfaced here. Always confirm against the ISO's published queue before relying on any value.