Substation Scout

Mystic Springs Renewable Energy Storage SLF

ERCOT queue ID 24INR0340

Queue ID24INR0340
Project nameMystic Springs Renewable Energy Storage SLF
Status (as published)SS Completed, FIS Completed, No IA
SubstationTap Royse Switch () – Poetry Switch ()
Point of interconnectionTap 345 kV Royse Switch (2478) – Poetry Switch (2485)
CountyKaufman
StateTX
Voltage345 kV
Capacity0 MW (0 MW as filed — net change or energy-only)
Resource (as published)OTH/BA
Resource categoryBattery (normalised for filtering)
Target commercial operation2028-03-31
Source datasetlarge

Additional filed fields

Interconnecting EntityMystic Spring Renewable Energy LLC
Cdr ZoneNORTH
Fuel CodeOTH
Technology CodeBA
Screening Study Complete44779
Fis Approved45764

Fields shown are those promoted into this dataset. The original ISO filing may contain further columns (study reports, agreement dates, milestone flags) that are retained in the pipeline but not all surfaced here. Always confirm against the ISO's published queue before relying on any value.