Substation Scout

Tap Royse Switch () – Poetry Switch () substation interconnection queue

2 active projects totalling 258.8 MW in the ERCOT queue.

2active projects
258.8active MW
2total filed
Queue IDProjectkVMWResourceStatus
24INR0339 Mystic Springs Renewable Energy Solar SLF 345 258.8 Solar SS Completed, FIS Completed, IA
24INR0340 Mystic Springs Renewable Energy Storage SLF 345 0 Battery SS Completed, FIS Completed, No IA

A request with terminal status left the queue as filed. That is a record of the filing, not evidence of injection capacity at this location. Confirm deliverability with ERCOT before relying on these figures.