Tap Royse Switch () – Poetry Switch () substation interconnection queue
2 active projects totalling 258.8 MW in the ERCOT queue.
2active projects
258.8active MW
2total filed
| Queue ID | Project | kV | MW | Resource | Status |
|---|---|---|---|---|---|
| 24INR0339 | Mystic Springs Renewable Energy Solar SLF | 345 | 258.8 | Solar | SS Completed, FIS Completed, IA |
| 24INR0340 | Mystic Springs Renewable Energy Storage SLF | 345 | 0 | Battery | SS Completed, FIS Completed, No IA |
Capacity that has left the queue does not automatically become available injection capacity — a withdrawal frees study position. Confirm deliverability with ERCOT before relying on these figures.