Tom Green, TX interconnection queue

13 active projects totalling 3,010.5 MW in the ERCOT queue.

13active projects
3,010.5active MW
13total filed
Queue IDProjectkVMWResourceStatus
29INR0328 Moon Chapel Solar 345 402 Solar SS Completed, FIS Started, No IA
29INR0365 Silver Sky Solar 345 401.9 Solar SS Started, FIS Started, No IA
27INR0445 Moon Chapel Wind 345 379.2 Wind SS Completed, FIS Started, No IA
25INR0339 Fort Concho Energy storage 138 251.2 Battery SS Completed, FIS Started, No IA
29INR0376 Silver Sky BESS 345 201.1 Battery SS Started, FIS Started, No IA
25INR0853 Tango Lily BESS 138 201 Battery SS Completed, FIS Started, No IA
29INR0231 Tango Lily Solar 138 201 Solar SS Completed, FIS Started, No IA
23INR0312 Hofbrau BESS 138 180.7 Battery SS Completed, FIS Started, No IA
20INR0247 Water Valley Wind Energy 345 180 Wind SS Completed, FIS Started, IA
26INR0083 Zeppelin Energy Storage n/r 163.9 Battery SS Completed, FIS Started, No IA
26INR0454 Dove Creek Solar 345 163.6 Solar SS Completed, FIS Started, No IA
26INR0455 Dove Creek Storage 345 162.5 Battery SS Completed, FIS Started, No IA
23INR0224 Morning Glory Solar 345 122.4 Solar SS Completed, FIS Started, No IA

A request with terminal status left the queue as filed. That is a record of the filing, not evidence of injection capacity at this location. Confirm deliverability with ERCOT before relying on these figures.