McLennan, TX interconnection queue

18 active projects totalling 3,383.6 MW in the ERCOT queue.

18active projects
3,383.6active MW
18total filed
Queue IDProjectkVMWResourceStatus
28INR0157 Axtell BESS 345 306.9 Battery SS Completed, FIS Started, No IA
24INR0038 Jaguar Solar 345 300.9 Solar SS Completed, FIS Started, IA
29INR0229 Brazos Energy Center 1 n/r 300.6 Battery SS Completed, FIS Started, No IA
29INR0230 Brazos Energy Center 2 n/r 300.6 Battery SS Completed, FIS Started, No IA
27INR0607 Prairie Phoenix Wind 345 297.3 Wind SS Completed, FIS Started, No IA
19INR0100 Prairie Hill Wind 345 297.2 Wind SS Completed, FIS Completed, IA
26INR0422 PowerVault BESS 345 254.8 Battery SS Completed, FIS Started, No IA
24INR0356 Cibeles Solar 345 252.3 Solar SS Completed, FIS Started, IA
28INR0363 Finch Storage 138 201.3 Battery SS Completed, FIS Started, No IA
28INR0294 Infrakey Waco Data Park Gas 1 345 180 Gas SS Completed, FIS Started, No IA
23INR0349 Tokio Solar 138 170.5 Solar SS Completed, FIS Started, IA
25INR0579 Albatross BESS 2 138 159.6 Battery SS Completed, FIS Completed, No IA
26INR0380 Pepper Solar Farm 345 120.7 Solar SS Completed, FIS Started, IA
26INR0252 Neutron Storage 345 104.5 Battery SS Completed, FIS Completed, IA
25INR0071 Albatross BESS n/r 50.4 Battery SS Completed, FIS Completed, No IA
26INR0111 Graphic Packaging Gas 138 43.4 Gas SS Completed, FIS Completed, IA
24INR0104 Braswell Solar 69 42.6 Solar SS Completed, FIS Started, No IA
27INR0498 Infrakey Waco Data Park Gas 2 138 0 Gas SS Completed, FIS Started, No IA

Capacity that has left the queue does not automatically become available injection capacity — a withdrawal frees study position. Confirm deliverability with ERCOT before relying on these figures.