Pepper Solar Farm
ERCOT queue ID 26INR0380
| Queue ID | 26INR0380 |
|---|---|
| Project name | Pepper Solar Farm |
| Status (as published) | SS Completed, FIS Completed, IA |
| Substation | Tap THOUSE__5 - ELM_MOTT_5 |
| Point of interconnection | Tap 345kV 3405 THOUSE__5 - 3406 ELM_MOTT_5 |
| County | McLennan |
| State | TX |
| Voltage | 345 kV |
| Capacity | 120.7 MW |
| Resource (as published) | SOL/PV |
| Resource category | Solar (normalised for filtering) |
| Target commercial operation | 2027-09-20 |
| Source dataset | large |
Tracked changes
1 change observed between weekly snapshots of the ERCOT queue since ERCOT tracking began on August 27, 2026. MW is nameplate as filed; for a capacity revision it is the change, not the new total.
| Detected | Change | MW | Status was → now |
|---|---|---|---|
| 2026-09-07 | Status change | n/a | SS Completed, FIS Started, IA → SS Completed, FIS Completed, IA |
Additional filed fields
| Interconnecting Entity | Pepper Solar Farm LLC |
|---|---|
| Cdr Zone | NORTH |
| Fuel Code | SOL |
| Technology Code | PV |
| Ia Signed | 45831 |
| Screening Study Complete | 45432 |
| Fis Approved | 46251 |
| Water Availability | Not Required |
Fields shown are those promoted into this dataset. The original ISO filing may contain further columns (study reports, agreement dates, milestone flags) that are retained in the pipeline but not all surfaced here. Always confirm against the ISO's published queue before relying on any value.