Maverick, TX interconnection queue

8 active projects totalling 1,508.3 MW in the ERCOT queue.

8active projects
1,508.3active MW
8total filed
Queue IDProjectkVMWResourceStatus
26INR0311 Senator Aggreko Solar 138 258.9 Solar SS Completed, FIS Started, IA
27INR0389 Sugaree Solar 138 251.4 Solar SS Completed, FIS Started, IA
27INR0465 Althea Storage n/r 251.3 Battery SS Completed, FIS Started, IA
27INR0253 Old Victory Energy Center 138 202.5 Battery SS Completed, FIS Started, No IA
24INR0142 De Los Santos 138 201 Battery SS Completed, FIS Started, No IA
24INR0617 Serrano Storage 138 185.6 Battery SS Completed, FIS Started, No IA
26INR0312 Senator Aggreko Storage 138 147.6 Battery SS Completed, FIS Started, IA
25INR0593 Escondido BESS 138 10 Battery In Queue

A request with terminal status left the queue as filed. That is a record of the filing, not evidence of injection capacity at this location. Confirm deliverability with ERCOT before relying on these figures.