Substation Scout

Maverick, TX interconnection queue

8 active projects totalling 1,505.9 MW in the ERCOT queue.

8active projects
1,505.9active MW
8total filed
Queue IDProjectkVMWResourceStatus
27INR0389 Sugaree Solar 138 251.4 Solar SS Completed, FIS Started, IA
27INR0465 Althea Storage n/r 251.3 Battery SS Completed, FIS Started, IA
26INR0311 Senator Aggreko Solar 138 251 Solar SS Completed, FIS Started, IA
27INR0253 Old Victory Energy Center 138 202.5 Battery SS Completed, FIS Started, No IA
24INR0142 De Los Santos 138 201 Battery SS Completed, FIS Started, No IA
24INR0617 Serrano Storage 138 185.6 Battery SS Completed, FIS Started, No IA
26INR0312 Senator Aggreko Storage 138 153.1 Battery SS Completed, FIS Started, IA
25INR0593 Escondido BESS 138 10 Battery In Queue

Capacity that has left the queue does not automatically become available injection capacity — a withdrawal frees study position. Confirm deliverability with ERCOT before relying on these figures.