De Los Santos
ERCOT queue ID 24INR0142
| Queue ID | 24INR0142 |
|---|---|
| Project name | De Los Santos |
| Status (as published) | SS Completed, FIS Started, No IA |
| Substation | Sunglow Substation |
| Point of interconnection | 78016 Sunglow Substation 138kV |
| County | Maverick |
| State | TX |
| Voltage | 138 kV |
| Capacity | 201 MW |
| Resource (as published) | OTH/BA |
| Resource category | Battery (normalised for filtering) |
| Target commercial operation | 2027-12-01 |
| Source dataset | large |
Additional filed fields
| Interconnecting Entity | BRP De Los Santos BESS LLC |
|---|---|
| Cdr Zone | SOUTH |
| Fuel Code | OTH |
| Technology Code | BA |
| Screening Study Complete | 44778 |
| Air Permit | Not Required |
Fields shown are those promoted into this dataset. The original ISO filing may contain further columns (study reports, agreement dates, milestone flags) that are retained in the pipeline but not all surfaced here. Always confirm against the ISO's published queue before relying on any value.