Senator Aggreko Solar

ERCOT queue ID 26INR0311

Queue ID26INR0311
Project nameSenator Aggreko Solar
Status (as published)SS Completed, FIS Started, IA
SubstationSunglow Substation (#)
Point of interconnection138 kV Sunglow Substation (#78016)
CountyMaverick
StateTX
Voltage138 kV
Capacity251 MW
Resource (as published)SOL/PV
Resource categorySolar (normalised for filtering)
Target commercial operation2029-03-31
Source datasetlarge

Additional filed fields

Interconnecting EntitySenator Aggreko Solar LLC
Cdr ZoneSOUTH
Fuel CodeSOL
Technology CodePV
Ia Signed46022
Screening Study Complete45411
Water AvailabilityNot Required

Fields shown are those promoted into this dataset. The original ISO filing may contain further columns (study reports, agreement dates, milestone flags) that are retained in the pipeline but not all surfaced here. Always confirm against the ISO's published queue before relying on any value.