Sugaree Solar

ERCOT queue ID 27INR0389

Queue ID27INR0389
Project nameSugaree Solar
Status (as published)SS Completed, FIS Started, IA
SubstationEscondido () to Brackettville ()
Point of interconnection138kV Escondido (8260) to Brackettville (8252)
CountyMaverick
StateTX
Voltage138 kV
Capacity251.4 MW
Resource (as published)SOL/PV
Resource categorySolar (normalised for filtering)
Target commercial operation2028-09-21
Source datasetlarge

Additional filed fields

Interconnecting EntitySugaree Solar LLC
Cdr ZoneSOUTH
Fuel CodeSOL
Technology CodePV
Ia Signed45929
Screening Study Complete45635
Air PermitNot Required
Water AvailabilityNot Required

Fields shown are those promoted into this dataset. The original ISO filing may contain further columns (study reports, agreement dates, milestone flags) that are retained in the pipeline but not all surfaced here. Always confirm against the ISO's published queue before relying on any value.