Substation Scout

Hopkins, TX interconnection queue

13 active projects totalling 2,216.5 MW in the ERCOT queue, plus 1 with terminal status (shown greyed).

13active projects
2,216.5active MW
14total filed
Queue IDProjectkVMWResourceStatus
27INR0451 Dairyland Storage 345 301.8 Battery SS Completed, FIS Started, No IA
20INR0203 Pine Forest Solar 345 301.5 Solar SS Completed, FIS Completed, IA
29INR0056 Palomino Solar 345 301.2 Solar SS Completed, FIS Started, No IA
26INR0577 Pine Forest BESS 2 n/r 201.1 Battery Inactive
27INR0097 JUNIPERUS BESS n/r 169.6 Battery SS Completed, FIS Started, No IA
23INR0495 Cartwheel BESS 2 345 156.9 Battery SS Completed, FIS Started, No IA
23INR0494 Cartwheel BESS 1 345 154.2 Battery SS Completed, FIS Completed, IA
29INR0057 Palomino Storage 345 152.5 Battery SS Completed, FIS Started, No IA
25INR0204 Cedar Range Solar 345 150.6 Solar SS Completed, FIS Started, IA
23INR0229 CH Solterra LLC 138 143 Solar SS Completed, FIS Started, No IA
29INR0189 Project Alpha Solar 138 122 Solar SS Completed, FIS Started, No IA
26INR0409 Lucky 7 Solar 345 101.4 Solar SS Completed, FIS Completed, IA
24INR0326 Blarney Solar 138 81.5 Solar SS Completed, FIS Started, IA
26INR0304 JUNIPERUSSS n/r 80.3 Solar SS Completed, FIS Started, No IA

Capacity that has left the queue does not automatically become available injection capacity — a withdrawal frees study position. Confirm deliverability with ERCOT before relying on these figures.