Substation Scout

CH Solterra LLC

ERCOT queue ID 23INR0229

Queue ID23INR0229
Project nameCH Solterra LLC
Status (as published)SS Completed, FIS Started, No IA
SubstationTap White Oak POI - Brinker POI
Point of interconnectionTap 138kV 11796 White Oak POI - 11797 Brinker POI
CountyHopkins
StateTX
Voltage138 kV
Capacity143 MW
Resource (as published)SOL/PV
Resource categorySolar (normalised for filtering)
Target commercial operation2027-05-31
Source datasetlarge

Additional filed fields

Interconnecting EntityCH Solterra LLC
Cdr ZoneNORTH
Fuel CodeSOL
Technology CodePV
Screening Study Complete44358
Air PermitNot Required
Water AvailabilityNot Required

Fields shown are those promoted into this dataset. The original ISO filing may contain further columns (study reports, agreement dates, milestone flags) that are retained in the pipeline but not all surfaced here. Always confirm against the ISO's published queue before relying on any value.