Substation Scout

Vantage Substation substation interconnection queue

2 active projects totalling 260 MW in the BPA queue, plus 2 with terminal status (shown greyed).

2active projects
260active MW
4total filed
Queue IDProjectkVMWResourceStatus
G0760 Not reported 500 590 Battery WITHDRAWN
G0602 Not reported 230 170 Solar STUDY COMPLETED
G0273 Not reported n/r 104 Wind WITHDRAWN
G0626 Not reported 230 90 Solar STUDY COMPLETED

A request with terminal status left the queue as filed. That is a record of the filing, not evidence of injection capacity at this location. Confirm deliverability with BPA before relying on these figures.