Kittitas, WA interconnection queue

1 active project totalling 108 MW in the BPA queue, plus 12 with terminal status (shown greyed).

1active projects
108active MW
13total filed
Queue IDProjectkVMWResourceStatus
G1034 Not reported 230 400 Wind WITHDRAWN
G1026 Not reported n/r 300 Wind WITHDRAWN
G114 Horizon Wind Energy-WRidge 230 252 Wind WITHDRAWN
G0597 Not reported 230 160 Solar WITHDRAWN
G105 Desert Claim 230 159 Wind WITHDRAWN
G0628 Not reported 500 125 Solar WITHDRAWN
G80 Kittitas Valley Wind 230 108 Wind ENERGIZED
G0273 Not reported n/r 104 Wind WITHDRAWN
G0212 Not reported n/r 100 Wind WITHDRAWN
G0634 Not reported 115 80 Solar WITHDRAWN
G0393 Not reported 345 75 Solar WITHDRAWN
G0364 Not reported n/r 50 Other WITHDRAWN
G0432 Not reported 230 18 Wind WITHDRAWN

A request with terminal status left the queue as filed. That is a record of the filing, not evidence of injection capacity at this location. Confirm deliverability with BPA before relying on these figures.