8 active projects totalling 2,110 MW in the BPA queue, plus 19 with terminal status (shown greyed).

8active projects
2,110active MW
27total filed
Queue IDProjectkVMWResourceStatus
G35 Grant Generation 500 1,300 Gas WITHDRAWN
G39 Grant Generation 500 1,300 Gas WITHDRAWN
G0760 Not reported 500 590 Battery WITHDRAWN
G0560 Not reported 230 500 Hydro WITHDRAWN
G0656 Not reported 230 500 Battery E&P EXECUTED
G1032 Not reported 500 500 Solar STUDY
G0668 Not reported 230 400 Solar STUDY
G0632 Not reported 230 300 Solar WITHDRAWN
G0742 Not reported 500 300 Wind WITHDRAWN
G0761 Not reported n/r 290 Wind WITHDRAWN
G0660 Not reported 230 200 Solar STUDY
G0740 Not reported n/r 200 Solar WITHDRAWN
G0767 Not reported n/r 200 Solar WITHDRAWN
G1030 Not reported 230 200 Solar WITHDRAWN
G0340 Not reported n/r 185 Wind WITHDRAWN
G0602 Not reported 230 170 Solar STUDY COMPLETED
G0845 Not reported 115 150 Solar WITHDRAWN
G1001 Not reported 230 150 Solar STUDY
G1043 Not reported 230 150 Battery WITHDRAWN
G1047 Not reported 230 150 Battery WITHDRAWN
G0325 Not reported 230 130 Wind WITHDRAWN
G0209 Not reported 230 124 Hydro WITHDRAWN
G0744 Not reported 500 100 Solar WITHDRAWN
G0828 Not reported 230 100 Battery STUDY
G0626 Not reported 230 90 Solar STUDY COMPLETED
G0588 Not reported n/r 80 Solar WITHDRAWN
G0600 Not reported n/r 80 Solar WITHDRAWN

A request with terminal status left the queue as filed. That is a record of the filing, not evidence of injection capacity at this location. Confirm deliverability with BPA before relying on these figures.