Snohomish substation interconnection queue

1 active project totalling 1 MW in the BPA queue, plus 1 with terminal status (shown greyed).

1active projects
1active MW
2total filed
Queue IDProjectkVMWResourceStatus
G0836 Not reported n/r 1 Solar WITHDRAWN
G0943 South Everett Community Solar Project n/r 1 Solar ENERGIZED

A request with terminal status left the queue as filed. That is a record of the filing, not evidence of injection capacity at this location. Confirm deliverability with BPA before relying on these figures.